the project is enclosed (so to speak) now and thoughts turn
gently t
The drywall is 95 % done and now comes the base cabinets and bar top.
True fear sets in when I think about the $$ for interior finish. Right now; galv. steel bar top, paint and maps for wall coverings, and reed fencing for the ceiling.
Lighting is going to be recovered florescent (read energy efficient) round "Mushroom" lights. boring but I got a pair at a rummage sale still in the box for $2.50! so provided they work well go with that. Accent lights will be drop down from the ceiling (pendants + rope lights+Christmas lights)